Lesson 2 showed that EV batteries are cobalt's biggest use. This page follows that thread: from batteries Europe will build to the metals they'll need, one tile feeding the next.
00

From cars to metals

The Battery materials page works through a chain: how many batteries Europe will build, what each battery is made of, and so how much raw material that takes. The Scenario slicer is set to Base case.

Battery demand by cathode chemistry (restricted-use)
cell · of cells in vehicles manufactured in Europe · Europe: EU27 plus UK · actual to 2025, forecast to 2030 · Base case · licensed forecast, restricted-use · as of Mar 2026 · assumed
2024202520262027202820292030
High NiMid NiL(M)FP

Stylised sketch: no real values.

Each bar is split by . Its tier, , means the source is licensed and can't be shared freely. Lesson 6 comes back to that.

01

Following a calculation across tiles

The tile says how many kg of each metal go into one kWh of battery.

Material intensity by chemistry (proprietary)
active material · kg per kWh, contained metal · not geographic · factor set v1 · Assumptions table · as of Sep 2026 · assumed
ChemistryCobaltGraphiteLithiumManganeseNickel
NCA0.120.950.100.000.67
NMC8110.080.950.100.080.66
NMC6220.181.000.110.170.53

The report also lists L(M)FP below these rows.

Multiply battery demand by intensity and you get for each metal. The units line up neatly: 1 GWh is a million kWh, so 1 GWh at 1 kg per kWh is a million kg, which is 1 kt.

Predict first: how much cobalt does 1 GWh of NMC811 cells need?

02

The biggest number isn't always the scarcest metal

Raw materials that demand requires (proprietary)
cathode and anode active material · kt contained metal; graphite as anode material · Europe: EU27 plus UK · 2024 and 2030 · Base case · battery demand × intensity factor set v1 · as of Sep 2026 · assumed
CommodityImplied demand 2024 ktImplied demand 2030 kt
Cobalt15.939.3
Graphite136.4563.4
Lithium14.454.9
Manganese13.540.6
Total262.1931.6

The report's total also includes nickel, in a row further down.

Predict first: why is graphite by far the largest figure?

03

Which tiles follow the scenario?

The Scenario slicer at the top right can switch away from the . Look for the words Base case in each tile's Basis line.

Battery demand by cathode chemistry… actual to 2025, forecast to 2030 · Base case · licensed forecast …
Raw materials that demand requires… 2024 and 2030 · Base case · battery demand × intensity …
Material intensity by chemistry… not geographic · factor set v1 · Assumptions table …
Recycling's contribution, 2030… EU27 · 2030 · Base case · ERMA recycler data …

Predict first: you switch the scenario. Which of these tiles stays exactly the same?

04

A chain is as strong as its weakest stage

The widest tile on the page follows each metal along the , from mine to cell. Each cell says how much of the EU's need operating EU capacity meets today, and how many points announced projects would add.

Europe's supply capacity today, and its potential, from raw material to cell (proprietary: ERMA, CRMA)
mine to cell, five stages · % of EU need met by operating EU capacity · EU27 · 2025 · ERMA project data; CRMA Tracker · as of Sep 2026 · reported
CommodityMineRefined chemicalPrecursor (pCAM)Active material (CAM, anode)Cell
Cobalt1% operating, +4 points announced19% operating, +5 points announced5% operating, +20 points announced8% operating, +30 points announced41% operating, +48 points announced
Graphite1% operating, +5 points announced0% operating, +7 points announced2% operating, +9 points announced41% operating, +48 points announced
Lithium2% operating, +12 points announced1% operating, +18 points announced8% operating, +30 points announced41% operating, +48 points announced
Manganese1% operating, nothing announced0% operating, +6 points announced5% operating, +20 points announced8% operating, +30 points announced41% operating, +48 points announced
Nickel7% operating, +2 points announced14% operating, +6 points announced5% operating, +20 points announced8% operating, +30 points announced41% operating, +48 points announced

Predict first: for lithium, where is Europe's weakest link today?

05

Same-looking numbers, different measures

Recycling's contribution to closing the gap, 2030 (proprietary)
recycling · % of implied demand, contained metal · EU27 · 2030 · Base case · ERMA recycler data over implied material demand · as of Sep 2026 · assumed
MetalRecycled share of implied demand 2030Regulation minimum 2031Regulation minimum 2036
Cobalt9%16%26%
Lithium4%6%12%
Nickel6%6%15%

The two right-hand columns are the EU for new batteries.

Predict first: nickel shows 6% against a 6% minimum. Is nickel on track?

06

The tiles at a glance

Battery demandThe starting point: GWh of cells, actual to 2025, forecast to 2030. A licensed, restricted-use source.
Material intensitykg per kWh for each chemistry. The same factors whatever the scenario.
Raw materials requiredDemand × intensity. Change either one and this tile moves.
Supply capacityFive stages from mine to cell, operating today plus announced. Read lesson 3 again before adding the two.
Recycling contributionRecycled supply against the battery rules' minimums. Similar, not identical, measures.
07

Three layers today

Three layers today: follow a calculation from tile to tile, check which tiles a slicer actually moves, and find the weakest stage in a chain. Next lesson: is supply getting more concentrated?

Follow the calculation across tiles. Check which tiles the scenario moves. Find the weakest stage.